About Us

At Crystal Fibro Concrete, our single goal is to bring innovation to this industry and to deliver quality work. We work meticulously on site, reading every architectural detail correctly and applying it correctly. We started out as Metaprekast, and today, as Crystal Fibro Concrete, we bring our solutions to life in the best possible way.

We work with the same care on our ongoing projects as on those we have already completed, and we keep growing through work that aims to lead and shape the industry.

Completed projects

  • Rixos Shamakhi Hotel (2010–2012): Precast panels, mouldings and architectural elements were integrated into the facade system to deliver a unified cladding solution.
  • Rixos Quba Hotel (2012–2014): Precast was chosen for the facade elements, including columns, arches, wall cladding, balustrades and mouldings, and the work was completed.
  • Ganjlik Underpass (2012): The walls were clad with bespoke precast elements featuring an integrated lighting system.
  • Aghdam City Hotel (2023–2024): Details of the facade cladding, shaft areas, canopy structures, copings and security booths were resolved and executed in precast in line with the design.
  • Park Akademi Yasamal (2024): We prepared the detailing of the floor mouldings and completed their precast production; installation was carried out by another contractor.
  • Badamdar Villa (2024): Precast work in line with the design was successfully completed throughout, including the villa, garden walls, terrace and storage areas.
  • Bilgah Villa (2024–2025): Precast cladding was used across the main house, outbuilding and gazebo, including mouldings, dado panels, window surrounds, columns, the chimney and parapets.
  • Yasamal Court of Appeal Building (2023–2024): Precast elements were used for floor mouldings, eave mouldings and column cladding, as well as the coat of arms.
  • Dünya Bakery, Sadarak (2024–2026): Clean-lined precast cladding with vertical column cladding and horizontal mouldings was designed and installed on the winter-garden facade.
  • Hilton Aghdam Hotel (2024–2026): Precast was applied to floor and balcony mouldings, columns, brackets, window surrounds and security booths; the project is complete.
  • Sea Breeze Palm Beach (2025–2026): Precast floor mouldings were applied on every level in line with the design; production and installation were completed successfully.
  • Sea Breeze Reception (2025–2026): Facade panels, floor mouldings and copings were installed, along with a precast entrance canopy with an integrated rainwater system; installation is complete.
  • Sea Breeze Shore House (2025–2026): Precast elements were used for the panels, eave and floor mouldings and copings; production is complete.
  • Bilgah Villa 2 (2025–2026): Manufacturing and installation of window surrounds, column cladding, floor and eave mouldings, parapets, arches and other architectural details were completed in line with the design.

Ongoing project

  • Shusha Mosque (2025–2026): Work is under way on the columns and the iwan connection details: a sample column has been produced, and production will begin once the detailing is complete.

We work to leave a mark on this industry. With our approach of sound planning, quality production and meticulous installation, we continue to add value to the sector and, through our work, to lead it and set its direction.

Completed Projects

Get a Quote